19. The inventory must be conducted by survey unit, and each survey unit must contain a sampling unit. The promoter must ensure that each cartographic stratum identified on the lot or part of a lot for the project contains at least one sampling unit.
M.O. 2022-11-17, s. 19.
In force: 2022-12-29
19. The inventory must be conducted by survey unit, and each survey unit must contain a sampling unit. The promoter must ensure that each cartographic stratum identified on the lot or part of a lot for the project contains at least one sampling unit.